After two generations of scaled models, which we mainly used for software and control validation, we started to test a full scale proof of concept beginning in the summer of 2023 at Salzburg Airport. After successful tests at the component level, the entire system was put into operation with regard to mechanical, electrical, acoustic and systemic criteria and the entire operating range was successively compared with the simulation results in real operation. These results are now incorporated into the following series development.